SHOP DRAWINGS AND SUBMITTALS

  • Performance evaluation and discussing the contractual decisions to achieve conformity with the accepted project in the contract.
  • Verification of the system for internal drainage in case of water penetration, thermal movement, diversion from building process, building allowance, suitable closing mechanism, seal methods, fireproofing and other requirements.
  • Verification of the constructive calculations, given by the subcontractors as an application to their design decisions.
  • Verification of the construction and drafted fabrication and work drawings.
  • Verification and discussion of the special requirements of the sides in the contract about quality control check during the project implementation.

5 D. Nemirov Str.
Sofia 1324, Bulgaria, EU




Studio CAD's Cloud

Studio CAD's Cloud